A House for the Eppsteins: Weekly Picture Log
Photos taken during the week of January 31, 2003
Last Week Next Week

Window installation was completed this week and the exterior doors were prepped. The siding below the porch roof is now in place. This siding is colored light green from the priming coat and the battens are still to be installed. Rough electrical work continued.

The house was sealed on Friday evening and a dehumidifier left running all weekend to dry the interior out completely. For this reason we did not have access inside during the weekend.